This project was secured in August 2017 via a competitive tender and let under a JCT Design and Build Contract 2011.The project consisted of the design and construction of 9No. 1-bedroom flats, 2No. 2-bedroom houses and 2No. 3-Bedroom houses, 13no. Dwellings in total, (six affordable flats and 2 houses and 3 private sale flats and 2 houses) together with associated external works (including parking, planting, landscaping, fencing, and paths), services, drainage, sewers, and works to the adoptable standard road and footpath.
The affordable housing will be let by the Comuunity Land Trust (CLT). The dwellings are traditional brick and block cavity walls construction integrated with Rock panel cladding and concrete panitiles for the roof coverings, UPVC double glazed windows and Hardwood composite doors. The internal finishes of the dwellings were completed to a high standard and with a modern asthetic appreance with Moore Kitchens Handless kitchens, carpets to the first floor areras and Polyflor Luxury Vinyl Tiles to the ground floor rooms.The externals consist of a large brick paviour car park with rising bollards and linked intercom system, landscaped areas finished with plants and trees inline with the local area and the ecology report.