This project was secured via a competitive tender and let under a JCT Design and BuildContract 2011, with novated Architects and Structural Engineers. The project will be carried out in 3No.Phases over a 2 year period.

The project involves the construction of 44 new dwellings, comprising of a mixture of bungalows and traditional housing incorporating between one and four bedrooms. This includes associated living spaces, together with garages and associated external works, landscaping, drainage and mains services installations.

The site is located in a large open field off an existing highway, and is accessed via High Street between existing properties. There are a number of existing residential properties outside the perimeter of the site (presumed occupied for health & safety purposes), and there is also the presence of the Mundesley Beck that runs through the site.

Client

Dewing Properties Limited

Architect

Chaplin Farrant

Employers Agent

Richard Utting

Contract Start Date

February 2017

Contract Completion Date

August 2019

Contract Value

£8,150,000

The 44No.Dwellings consist of 36No.Private dwellings and 8No.Affordable homes. Construction of all dwellings comprised of traditional brick and block cavity walls with an array of brick, flint and render finish, trenched foundations with composite insulated concrete floor slab, trussed roofs with concrete pan tile and slate tile finish, Hardwood timber sash & casement windows and doors, GRP composite front doors, and gas central heating and water services.

With every home there is a range of luxury finishes, with a variety of options to choose from in the early stages of construction, including the kitchen, flooring and tiling finishes. The dwellings will benefit from certain modern touches such as PIR lighting to the hall and entrance, and spotlights throughout the ground floor and bathrooms.As part of the development there is a stunning landscaped area of open green space, with small bridges over the Mundesley Beck River and a pathway leading directly to Water Lane for easy access to amenities.

With the surrounding properties there is anawareness of local neighbours and regular liaison with them wasrequired. This was carried out through letter drops, face to face meetings on a consistent basis, and adhering to working within strict daily start and finish times to mitigate noise pollution and traffic within the vicinity. With the single existing access route into site, particular consideration was to be given to avoiding conflict between pedestrian and vehicular routes to ensure safe pedestrian access for the duration of the works.With the site having restricted access it was imperative to programme the sequence of works to co-ordinate all trades and elements of work efficiently. Adequate site traffic management plans were implemented to aid with all movements on site and to prevent any accidents.

To achieve the above, after the initial site clearance works and site compound area was installed, the first objective was to create the main adoptable access road into the site from the High Street. This then provided a clean and level road onto site for all traffic, but in particular large plants and delivery vehicles, to gain access to the construction works for Phase 1 plots.

As of the end of August 2017, we have installed all 13No.Plots and Garages in Phase 1 up to roof level, as well as the roads and drainage for this phase.Overall the Client has been extremely satisfied with the works to date, and agood working relationship has been established with Dewing Properties, which we would hope to replicate on future schemes.